Standard Description
Equipped with the zero leak bidirectional checking sole-noid valves, this energy unit is intended for that operation of two independent circuits. Which are respectively for that main and subordinate platforms of the double scissors lift. Two cut-off valves are utilised for decreasing the machine manually in case of electrical power loss. If extra independent circuits are expected for the application please make contact with us for availability.
Remark: one. Please seek advice from our product sales engineer for your various pump displacement, motor power or tank capability.
2. CSA or UL certified motors are available on request.
Specific Notes
1. The AC motor is of S3 duty cycle, which could only function intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean every one of the hydraulic elements concerned just before set up of the energy unit.
3. Viscosity with the oil shoud be 15~46 cst,as well as oil ought to be clean and cost-free of impurities,N46 hydraulic oil is advised.
4. The energy unit should be mounted vertically.
5. Check the oil degree within the tank soon after the preliminary running with the energy unit.
six. Oil modifying is needed immediately after the initial one hundred operation hours,afterwards the moment just about every 3000 hours.
Electrical power UNITS FOR DOUBLE-SCISSORS LIFT
Tags: